体中文
English
本語
Trains
Lines
Journey
Destinations
photo by 捧一池星光

CR400BF-A

Born in 2017-12

Home
Trains
CR400BF Series
Detail
CR400BF-A

CR400BF-A EMU Train was born in December 2017, belongs to the CR400BF series, 8M8T in marshalling, the hole length is 414.26 m, has a maximum design speed of 350 km/h, and 385 km/h in the experiment

CR400BF-A动车组是在CR400BF基础上设计生产的16辆编组的高速动车组。

2017年11月10日,中国铁路总公司发布公告,将采购16辆长编组“复兴号”动车组,首批50列。

2018年02月05日,CR400BF-A下线。

2018年03月01日,CR400BF-A-3024、5048到达铁道科学院进行测试。

2018年03月24日,CR400BF-A-3024启程前往沈阳。

2018年03月26日,CR400BF-A-3024开始在沈阳局集团管内进行试验。

2018年04月07日,CR400BF-A-5048到达沈阳。

2018年06月起,CR400BF-A逐步在京沪高铁上线运营。

2018年10月起,CR400BF-A逐步在更多线路运营。其中CR400BF-A-5161使用永济电机YGZN2Q256型牵引变流器。

Photo by 京彩上铁
Appearance
CR400BF-A-3052担当D7165(广州南-珠海)出中山站
View in bilibli 4O4你在说什么 / 2021年02月21日
Technical Parameter
Speed
350 km/h
Design speed
350 km/h
Operating speed
385 km/h
Maximum experimental speed
Appearance
8M8T
Marshalling
414.26 m
Total length
3360 mm
Width
4050 mm
Height of Car Body
27580 mm
Distance between center of couplers of head cars
27255 mm
Body length of head cars
25650 mm
Distance between center of couplers of middle cars
25000 mm
Body length of middle cars
17800 mm
Center distance of the bogies
2500 mm
Wheelbase of bogies
920/920 mm
Diameter of the new wheel(M/T)
1000 mm
Height of center of coupler
935 mm
Height of center of coupler of middle cars
17 t
Max Axle load
Power
YJ268A × 32
Motor model
650 kw
Motor power
20800 kw
Installed power
20280 kw
Wheel Power
Performance
1.764 km/h/s
Calibrated initial acceleration (not actual use)
250 m
The minimum radius of the curve that can be passed
280 + 10 + 280 m
The minimum radius of an S-shaped curve that can be passed
-25~40
Operating temperature
Control
CTCS3-300S/T
Train control systems
More
LMB10
Tread tyoe
Parking brake
CX-GI032
Pantograph model
22.5 ~ 29 kV
Normal operating voltage
5150 ~ 6500 mm
Pantograph working height
DC110 V
Battery voltage
3NAC380V
External power supply voltage
Service facilities
Air
Conditioned
AC 220v
Electrical outlet
USB
Charging port
Food supply
Dining bar
Hot water
Tea stove
Rest rooms
Toilets
Barrier free
Braille and Wheelchair area
Suitable for infants
Infant care facility
Power outlet location
Business Class
First Class
Second Class
Train formation and seat arrangement
16
Cars

1193
Seat Number
Car 01 / Tc SW (17)
Car 02 / M ZY (60)
Car 03 / Tp ZE (90)
Car 04 / M ZE (90)
Car 05 / M ZE (90)
Car 06 / Tp ZE (90)
Car 07 / M ZE (90)
   Car 08 / T ZE (75)
Car 09 / T ZEC (48)
Car 10 / M ZE (90)
Car 11 / Tp ZE (90)
Car 12 / M ZE (90)
Car 13 / M ZE (90)
Car 14 / Tp ZE (90)
Car 15 / M ZY (60)
Car 16 / Tc ZYS (28+5)
Seat type and number
22
Business Class Seats
china-emu.cn
148
First-class seats
china-emu.cn
1023
Second-class seats
china-emu.cn
Manufacturer and batch
Manufacture by CRRC Changchun
CR400BF-A-5048~5067、5082~5096、5156~5161 (41 in all)
Beginning of delivery since 2018-02. Put into operation at 2018-06 
Manufacture by CRRC Tangshan
CR400BF-A-3024~3033、3050~3058、3092~3105 (33 in all)
Beginning of delivery since 2018-02. Put into operation at 2018-06 
The schematic diagram is automatically generated and only for reference.
Upgraded at 2022-01-07
* M: Motor Car; Mc: Motor car with driver's cab; Mp: Motor car with driver's pantograph; T: Trailer Car; Tc: Trailer car with driver's cab; Tp: Trailer car with driver's pantograph
* ZE: Second-class car; ZY: First-class car; ZS: Business Car; ZET: Second-class and Premier-class car; ZES: Second-class and business car; ZYT: First-class and Premier-class car; ZYS: First-class and business car; ZEC: Second-class car with dining room; WR: First-class sleeper car; WE: Second-class sleeper car; WY: First-class sleeper car; WG: Luxury sleeper car; WRC: First-class sleeper car with dining room; CA:Dining car
Models of this Series

Main References

See all…
**We are not the official website of CR or CRRC!