CRH6A(三门)动车组2015年12月问世,属于Cinova/CRH6系列,4M4T编组,列车全长201.4 m,设计速度200 km/h 。
CRH6A (Three doors in one compartment)
EMU Train was born in 2015/12, belongs to the Cinova/CRH6 series, 4M4T in marshalling, the hole length is 201.4 m, has a maximum design speed of 200 km/h.