CRH6A-A (Gen 2)
EMU Train was born in April 2023, belongs to the Cinova 2.0 series, 2M2T in marshalling, the hole length is 100.67 m, has a maximum design speed of 200 km/h, and 220 km/h in the experiment
The minimum radius of the curve that can be passed
180 + 10 + 180 m
The minimum radius of an S-shaped curve that can be passed
-25~40 ℃
Operating temperature
Control
CTCS2 ATO
Train control systems
More
√
Parking brake
DSA250
Pantograph model
22.5 ~ 29 kV
Normal operating voltage
5150 ~ 6500 mm
Pantograph working height
DC110 V
Battery voltage
3NAC380V
External power supply voltage
Interior design
Service facilities
Air Conditioned
AC 220v
Electrical outlet
USB
Charging port
Rest rooms
Toilets
Barrier free
Braille and Wheelchair area
Suitable for infants
Infant care facility
Frmation and seat arrangement
There are several versions of this model
标准版
4
Cars
222
Seat Number
Car 01 /
Mc
ZE
(40)
Car 02 /
Tp
ZE
(52+14)
Car 03 /
Tp
ZE
(52+20)
Car 04 /
Mc
ZE
(48)
Seat type and capacity
188
Second-class seats with unadjustable backrest
china-emu.cn
34
Folding seats or Simple seats
china-emu.cn
The orientation of the seats cannot be changed
Manufacturer and batch
Manufacture by
CRH6A-A-0219 (1 in all)
Beginning of delivery in 2023-01
样车
CRH6A-A-0220~0223 (4 in all)
Beginning of delivery in 2023-12. Put into operation at 2024-01
武汉都市圈新城快线
回首之约
4
Cars
188
Seat Number
Car 01 /
Mc
ZE
(40)
Car 02 /
Tp
ZE
(32)
Car 03 /
Tp
ZE
(52+20)
Car 04 /
Mc
ZE
(40+4)
Seat type and capacity
132
Second-class seats
china-emu.cn
56
Folding seats or Simple seats
china-emu.cn
Standing space for400 people. The orientation of the seats cannot be changed
Manufacturer and batch
Manufacture by
CRH6A-A-0224~0225 (2 in all)
Beginning of delivery in 2024-07. Put into operation at 2024-11
三亚至乐东铁路
天涯海角
4
Cars
220
Seat Number
Car 01 /
Mc
ZE
(40)
Car 02 /
Tp
ZE
(64)
Car 03 /
Tp
ZE
(52+20)
Car 04 /
Mc
ZE
(40+4)
Seat type and capacity
132
Second-class seats
china-emu.cn
88
Folding seats or Simple seats
china-emu.cn
Standing space for400 people. The orientation of the seats cannot be changed
Manufacturer and batch
Manufacture by
CRH6A-A-0226~0227 (2 in all)
Beginning of delivery in 2024-07. Put into operation at 2024-11
三亚至乐东铁路
凤舞九天
4
Cars
204
Seat Number
Car 01 /
Mc
ZE
(40)
Car 02 /
Tp
ZE
(12+24)
Car 03 /
Tp
ZE
(52+20)
Car 04 /
Mc
ZE
(40+4)
Seat type and capacity
132
Second-class seats
china-emu.cn
24
Multi functional seat
china-emu.cn
48
Folding seats or Simple seats
china-emu.cn
Standing space for400 people. The orientation of the seats cannot be changed
Manufacturer and batch
Manufacture by
CRH6A-A-0228~0229 (2 in all)
Beginning of delivery in 2024-07. Put into operation at 2024-11
三亚至乐东铁路
The schematic diagram is automatically generated and only for reference.
Upgraded at 2024-11-20
*
M: Motor Car; Mc: Motor car with driver's cab; Mp: Motor car with driver's pantograph; T: Trailer Car; Tc: Trailer car with driver's cab; Tp: Trailer car with driver's pantograph
*
ZE: Second-class car; ZY: First-class car; ZS: Business Car; ZET: Second-class and Premier-class car; ZES: Second-class and business car; ZYT: First-class and Premier-class car; ZYS: First-class and business car; ZEC: Second-class car with dining room; WR: First-class sleeper car; WE: Second-class sleeper car; WY: First-class sleeper car; WG: Luxury sleeper car; WRC: First-class sleeper car with dining room; CA:Dining car