CJ5E-B
EMU Train was born in January 2024, belongs to the 中车长春城际动车组 series, 2M1T in marshalling, the hole length is 78.3 m, has a maximum design speed of 120 km/h, and 120 km/h in the experiment
原CJ5-0505/0506两组列车经过改造,仅设置柴油机和电池组,不再设置受电弓,同时将原列车裙板简化,便于日常检修维护。列车最高运行速度120 km/h,纯电模式最大行驶里程20 km(最高60 km/h),共设置201个座位,最大载客量565人,可支持重联运行,支持智能监控、智能诊断,两组列车于2024年01月31日交付西安地铁。