CJ5E-A
EMU Train was born in June 2020, belongs to the 中车长春城际动车组 series, 2M2T in marshalling, the hole length is 104.1 m, has a maximum design speed of 160 km/h, and 180 km/h in the experiment
2020年07月,全型头型的CJ5E-A动车组下线,并于07月08日抵达铁道科学院环形铁道进行试验。采用CRH3A的头型,增加了独立的司机室门,乘客门调整为三扇双开门,更加适用于城际和市域铁路快速乘降的需求。该车可选配是否加装动力电池,即可作为普通列车使用,也可以选配电池成为混动。