体中文
English
本語
Trains
Lines
Journey
Destinations
photo by Aiklld2364

CR200J1-D

Born in 2022-10

Home
Trains
CR200J(3.0) Series
Detail
CR200J1-D

CR200J1-D EMU Train was born in October 2022, belongs to the CR200J(3.0) series, 1M8T in marshalling, the hole length is 236.46 m, has a maximum design speed of 160 km/h,

首批CR200J1-D型动车组针对丽香铁路特点特别打造,采用六轴动力车,适合高海拔、坡度大的线路。同时配备商务座,对坐席布局进行优化,座椅间距加大,全部座椅改为可旋转,乘坐体验提升。同时加设空调压力保护装置,优化车窗、风挡设计,提升隧道运行和会车时的舒适度。

2022年10月21日首次曝光,历经多次修改涂装,2022年11月15日株洲产动力车到达南京与非动力车进行总装调试。

2022年11月23日,首批两组列车出厂交付昆明局集团,并于2022年12月02日起在昆明至大理间试运行。2023年07月01日起,CR200J1-D-2808、2809两组列车在青藏铁路西宁至格尔木间运行。

2023年09月29日,第二批四组列车交付青藏公司。

Photo by Aiklld2364
Appearance
Cold resistance
≤-40℃
Sand resistance
>11级风+沙尘
High Altitude Applicable
>3000 m
Technical Parameter
Speed
160 km/h
Design speed
165 km/h
Operating speed
Appearance
1M8T
Marshalling
236.46 m
Total length
3360 mm
Width
4433 mm
Height of Car Body
28300 mm
Distance between center of couplers of head cars
27955 mm
Body length of head cars
26300 mm
Distance between center of couplers of middle cars
25500 mm
Body length of middle cars
18000 mm
Center distance of the bogies
2600 mm
Wheelbase of bogies
1250/915 mm
Diameter of the new wheel(M/T)
880 mm
Height of center of coupler
880 mm
Height of center of coupler of middle cars
14 t
Axle load when unloaded
15.9 t
Max Axle load
Power
HXD1D-J
动力车型号
中车株洲电力机车有限公司
制造厂商
24634 mm
车钩中心距
11760 mm
转向架中心距
2000 + 2150 mm
转向架轴距
21 t
最大轴重
Co'Co'
轴式
YQ-1224-4 × 6
电机型号
1224 kw
电机功率
7344 kw
装机功率
7200 kw
轮周功率
420 kN
起动牵引力
Performance
150 m
The minimum radius of the curve that can be passed
180 + 10 + 180 m
The minimum radius of an S-shaped curve that can be passed
-50~40
Operating temperature
Control
LKJ2000
Train control systems
More
Parking brake
TSG15B
Pantograph model
17.5 ~ 31 kV
Normal operating voltage
4780 / 7180 mm
Maximum and minimum height of pantograph
5200 ~ 6500 mm
Pantograph working height
DC110 V
Battery voltage
3NAC380V
External power supply voltage
Service facilities
Air
Conditioned
AC 220v
Electrical outlet
USB
Charging port
Food supply
Dining bar
Hot water
Tea stove
Rest rooms
Toilets
Barrier free
Braille and Wheelchair area
Suitable for infants
Infant care facility
Power outlet location
Business Class



See the service guide
or
consult the service staff
First Class
Second Class
Train formation and seat arrangement
9
Cars

676
Seat Number
Moter Car Mpc HXD1DJ
Car 01 / T ZE (95)
Car 02 / T ZE (95)
Car 03 / T ZE (95)
   Car 04 / T ZEC (72)
Car 05 / T ZE (95)
Car 06 / T ZE (95)
Car 07 / T ZE (95)
Car 08 / Tc KZ(ZYS) (28+6)
Seat type and number
6
Business Class Seats
china-emu.cn
28
First-class seats
china-emu.cn
642
Second-class seats
china-emu.cn
Manufacturer and batch
Manufacture by CRRC Nanjing Puzhen
CR200J1-D-2801~2809 (9 in all)
Locomotives manufacture by CRRC Zhuzhou
Beginning of delivery in 2022-11. Put into operation at 2022-12 
CR200J1-D-2810~2813 (4 in all)
Locomotives manufacture by CRRC Zhuzhou
Beginning of delivery in 2023-09. Put into operation at 2023-10 
CR200J1-D-2814~2827 (14 in all)
Locomotives manufacture by CRRC Zhuzhou
Beginning of delivery since 2024-05. Put into operation at 2024-06 
The schematic diagram is automatically generated and only for reference.
Upgraded at 2023-09-30
* M: Motor Car; Mc: Motor car with driver's cab; Mp: Motor car with driver's pantograph; T: Trailer Car; Tc: Trailer car with driver's cab; Tp: Trailer car with driver's pantograph
* ZE: Second-class car; ZY: First-class car; ZS: Business Car; ZET: Second-class and Premier-class car; ZES: Second-class and business car; ZYT: First-class and Premier-class car; ZYS: First-class and business car; ZEC: Second-class car with dining room; WR: First-class sleeper car; WE: Second-class sleeper car; WY: First-class sleeper car; WG: Luxury sleeper car; WRC: First-class sleeper car with dining room; CA:Dining car
Models of this Series

Main References

See all…
**We are not the official website of CR or CRRC!